Project Process Outline
Initial Consultation – Showroom/Home
- Space Requirements
- Design/Style Preferences
- Budget
- Financing
- Timing/Special Event
- Payment Terms
- Before Photos
Design Phase
- Present Design Concept
- Design Deposit
- Confirm design, select colors, cabinet choices
- Prepare working drawings
- Check Measurement
- Sub Contractor Bids

Construction Phase
Formal Design Presentation
- Contract Agreement
- 50% payment
- Order cabinets, granite, floor coverings, fixtures
- Schedule Contractors
- Stradlings Yard Sign Installed
Demolition & Reconstruction Phase
- Remove old cabinets/countertops/etc
- Clear out walls and finish materials if necessary
- Framing
- Drywall/Finishing
- Rough & Finish Electrical & Plumbing
- Painting
Change Order/Modification
Cabinet Delivery/Installation
- 100% Payment Due
- Countertop Templating/Sink On-Site
- Appliances must be on site
Installation, granite, tile, appliances, fixtures
- Countertops
- Floor Coverings
Project Completion Final Inspection
- Complete Punch-list
- Photos of Finished Job
Return to Top